Project Details

Client
Solihull College & University Centre
Location
Woodlands Campus, Solihull College
City
Solihull
Contract Type
JCT 2024 D & B
Duration
18 WEEKS
Valuation
£684,000
Category
Education
Size
661 m²

  • 01

    OVERVIEW

    The works comprised the complete design, construction and formation of new extension to the existing motor vehicle workshop together with associated external works and below ground drainage at the Solihull College Woodlands Campus.

     

    Transferring project knowledge we worked with the original steel frame contractor who completed the main frame to the college when originally built.  Bringing this as a built model meant the process of design & manufacture of the steel frame was sped up as no investigative works needed to be completed on site to inform the design.

     

  • 02

    OUR APPROACH

    Working within a live college environment required a carefully planned approach that prioritised safety, segregation, and minimal disruption. To achieve this, site mobilisation and establishment were accelerated and completed during the Easter shutdown period, ensuring all physical controls, access arrangements, and segregation measures were fully in place before students and staff returned.

     

    Throughout the project, the programme was aligned with college holiday periods wherever possible, allowing more disruptive activities to be undertaken when the campus was less occupied. This strategic approach minimised the impact on day-to-day college operations, maintained a safe learning environment, and enabled the project to progress efficiently while ensuring the continued functionality of the facility for students and staff.

  • 03

    CHALLENGES & SOLUTIONS

    One of the key challenges was the demolition of the existing motor vehicle workshop façade, which had the potential to generate significant noise. To mitigate disruption, works were scheduled during the Easter holiday period, allowing the façade to be removed while students were off site. The same approach was adopted during other holiday periods to further reduce the impact on college operations.

     

    Maintaining a safe and secure separation between construction activities and occupied areas was also critical. Robust site segregation measures, including secure fencing and internal hoardings, were implemented throughout the project. Any changes to access routes or working arrangements were communicated through regular stakeholder meetings, ensuring all parties remained informed and engaged.

     

    This proactive approach enabled challenges to be addressed quickly and effectively, with the client commenting that “any issues that arose during the project were dealt with quickly and professionally, and the team was always willing to discuss solutions when needed.”

     

  • 04

    COLLABORATION & COMMUNICATION

    Strong collaboration and clear communication underpinned the successful delivery of the project. From the outset, a structured engagement strategy fostered positive working relationships across the Estates Department, Facilities Management team, and wider stakeholders, with clear communication channels established throughout.

     

    Regular updates and weekly programmes provided full visibility of progress and upcoming activities, ensuring stakeholders remained informed and aligned at every stage. As the client noted, “Communication from the Site Manager and wider team was excellent, stakeholders were kept informed as the works progressed.”

     

    This proactive and collaborative approach helped ensure the project was delivered on time, within budget, and comfortably ahead of the new college term, allowing the facilities to be fully operational and ready for occupation.

  • 05

    HANDOVER

    Delivering a successful project extends beyond construction completion. Through early planning and close collaboration with the client, a detailed exit and handover strategy was implemented, ensuring all documentation requirements were clearly defined and agreed. Draft O&M manuals were provided three weeks in advance of completion, allowing sufficient time for review and refinement. At final handover, the client received a complete, well-structured documentation package together with hands-on training for all newly installed equipment and operational systems. This approach minimised disruption, maximised user confidence, and ensured the space was fully ready for occupation and operation from day one.
  • 06

    OUTCOME

    We have a very happy Client, with positive feedback, leading to us talking directly to the Client about the forthcoming brickwork workshop project. ‘…they did a fantastic job, one of the best finishes I’ve seen for building work over my years in further education.’

     

    We were delighted to organise a work placement for a Solihull College student.  An enthusiastic and willing local young person, we presented them with a toolbox and equipment on completion.