Great Oaks College, Windmill Road, Sunbury on Thames
A modern, purpose-built educational facility. We transformed this space from an existing office building, supporting the client’s vision of creating an inclusive environment combining learning, wellbeing, and community spaces within a single campus.
Project Details
-
01
OVERVIEW
A comprehensive refurbishment and change of use of the existing two-storey office building to create a fully operational and accessible college facility.
The completed development provides a range of specialist teaching, sensory, therapeutic, administrative, and social spaces designed to meet the needs of students, staff, and visitors. Extensive external improvements further enhanced accessibility, safety, security, and the overall campus experience.
By repurposing the existing building, the scheme delivered a flexible and welcoming facility that supports the client’s current operational requirements while providing capacity for future growth.
-
02
OUR APPROACH
Our approach began with a detailed assessment of the existing structure, building services and occupancy requirements to determine how the building could successfully be adapted to meet the needs of students, staff and visitors.
Internal alterations reconfigured the ground floor to accommodate specialist sensory and teaching classrooms, therapy and sensory spaces, a café and dining hall, common areas, reception, administrative offices, catering facilities, and associated welfare accommodation. The first floor was adapted to provide dedicated office space for the college’s operational team.
The works were supported by a programme of external improvements, including new paving and landscaping, modifications to fire escape arrangements, installation of security fencing and external lighting, and the introduction of additional glazing to the eastern elevation to maximise natural daylight and improve the overall environment for building users.
-
03
CHALLENGES & SOLUTIONS
As the facility was being prepared for occupation by students with significant additional needs, a key project challenge was ensuring a smooth and familiar transition into the new environment. To support this, the project team facilitated a series of structured familiarisation visits, allowing the Client to undertake detailed walkthroughs of every area of the building over several days prior to handover. This proactive approach enabled the Client to fully understand the layout and functionality of each space, helping to minimise disruption and provide reassurance for students transitioning to an unfamiliar setting.
A further challenge arose during the final week of the programme when the Client’s independently appointed IT contractor commenced installation works. This introduced the potential for clashes with completed elements of the refurbishment and required careful coordination to protect finished works while maintaining programme certainty. Through close collaboration, responsive design adjustments, and proactive stakeholder management, evolving requirements were successfully incorporated without impacting the agreed completion date.
-
04
COLLABORATION & COMMUNICATION
Throughout the project, we maintained regular engagement with key stakeholders through weekly progress meetings with representatives from Great Oaks, supplemented by monthly site meetings. This consistent communication fostered a strong collaborative relationship, enabling timely decision-making and the effective resolution of project matters.
Daily, weekly, and monthly meetings were also held with the Client to review progress, programme, and operational requirements. As project demands evolved, open communication and proactive management ensured challenges were addressed promptly, maintaining momentum and supporting successful project delivery.
Commercially, close collaboration between both parties’ quantity surveyors contributed to a positive and efficient final account process. Agreement was achieved promptly, exceeding Alcema’s initial assessment and reflecting the strong professional relationships, transparency, and collaborative approach maintained throughout the project.
-
05
OUTCOME
The transformation of this former office building has provided Great Oaks with a vibrant, inclusive, and future-ready educational environment tailored to the needs of its students and staff.
The newly created facility delivers high-quality teaching, sensory, therapeutic, and social spaces that support learning, wellbeing, and personal development in a safe, accessible, and welcoming setting. The ground floor now offers a diverse range of specialist educational facilities, while the first floor provides operational space for the college, with flexibility for future expansion into additional teaching accommodation as demand grows.
Delivered through close collaboration with the client and stakeholders, the project has unlocked the full potential of an existing building, creating a sustainable long-term asset that will serve the Great Oaks community for years to come. The result is much more than a refurbishment; it is a carefully considered learning environment that empowers students, supports staff, and enables the college’s continued growth and success.